{"id":3327,"date":"2023-11-03T10:40:53","date_gmt":"2023-11-03T10:40:53","guid":{"rendered":"https:\/\/shreepost.com\/?p=3327"},"modified":"2023-11-03T10:40:53","modified_gmt":"2023-11-03T10:40:53","slug":"two-electricity-distribution-substations-inaugurated","status":"publish","type":"post","link":"https:\/\/shreepost.com\/?p=3327","title":{"rendered":"Two electricity distribution substations inaugurated"},"content":{"rendered":"<p><a href=\"https:\/\/shreepost.com\/2023\/10\/19\/nepal-extends-t20i-triangular-series-winning-streak-with-victory-over-hong-kong\/\">\u00a0Two power distribution substations<\/a>, each of <a href=\"https:\/\/thehimalayantimes.com\/business\/newly-built-33-11-kv-saranghat-substation-inaugurated\">33\/11 kV capacity<\/a>, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme.<\/p>\n<p>One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant provided by the German government through KfW Development Bank.<\/p>\n<blockquote><p>Nepal Electricity Authority (NEA) executive-director Kulman Ghising and KfW&#8217;s director for Regional Office for Nepal and Bangladesh, Michael Sumser-Hellstern jointly inaugurated the Ratmate substation. Similarly, Ghising and KfW South Asia Deputy Director, Christoph Kessler jointly inaugurated the Kalikasthan-based substation. Electricity supply has been locally made from the substation.<\/p><\/blockquote>\n<p>The German government had, through the KfW Development Bank, provided a grant assistance of 5 million Euros (approximately Rs 700 million) for the reconstruction, expansion and strengthening of the power distribution system network in Nuwakot and Rasuwa following the devastating earthquake of April 2015.<\/p>\n<p>Two distribution substations, 33kV, 11kV and LT line have been constructed with this grant support. More than 1,200 households in the two districts will have reliable power supply to their homes with this.<\/p>\n<p>On the occasion, NEA Executive-Director Ghising said KfW has provided much support in the development of projects related to hydropower, transmission line and distribution system in Nepal. He added that the consumers in these areas have availed of reliable and quality power supply with the construction of these two substations.<br \/>\nHe believed that improved power supply in the region will encourage opening of cottage industries.<\/p>\n<p>KfW&#8217;s Sumser-Hellstern and Kessler said that Nepal and Germany have over 60 years&#8217; relations and Germany has been providing cooperation for the development of energy sector in Nepal since 40 years back. They said this cooperation would now be extended towards electricity transmission and distribution sectors as well.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3329,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"slim_seo":{"title":"Two electricity distribution substations inaugurated - Shree Post","description":"\u00a0Two power distribution substations , each of 33\/11 kV capacity , have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-"},"footnotes":""},"categories":[20],"tags":[6263,6271,6275,6269,6274,6272,6268,6266,6267,1803,6273,6264,6262,6265,6270],"class_list":["post-3327","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-33-11-kv-capacity","tag-cottage-industries","tag-distribution-sectors","tag-earthquake-reconstruction","tag-electricity-transmission","tag-energy-sector-development","tag-grant-assistance","tag-kalikashan-substation","tag-kfw-development-bank","tag-nepal-electricity-authority-nea","tag-nepal-germany-cooperation","tag-nepal-germany-economic-support-programme","tag-power-distribution-substations","tag-ratmate-substation","tag-reliable-power-supply"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5 - aioseo.com -->\n\t<meta name=\"description\" content=\"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Shree Post\"\/>\n\t<meta name=\"google-site-verification\" content=\"EFgOVK1wDx8T7ezNrLPN4nWq0wE6SeBOdCKs7scNI-Q\" \/>\n\t<meta name=\"keywords\" content=\"33\/11 kv capacity,cottage industries,distribution sectors,earthquake reconstruction,electricity transmission,energy sector development,grant assistance,kalikashan substation,kfw development bank,nepal electricity authority (nea),nepal-germany cooperation,nepal-germany economic support programme,power distribution substations,ratmate substation,reliable power supply,news\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/shreepost.com\/?p=3327\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Shree Post - The News Werbsite, hot news, sports,cricket, football,world news, how to make money,  how to make money online for beginners, how to earn money online without investment, how to earn money online for students, how to earn money online without investment in mobile, make money online from home, how to make money online for free, real ways to make money from home for free, how to earn money from home without any investment,\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Two electricity distribution substations inaugurated -\" \/>\n\t\t<meta property=\"og:description\" content=\"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/shreepost.com\/?p=3327\" \/>\n\t\t<meta property=\"fb:admins\" content=\"https:\/\/www.facebook.com\/visionnepal24\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1371\" \/>\n\t\t<meta property=\"og:image:height\" content=\"902\" \/>\n\t\t<meta property=\"article:tag\" content=\"33\/11 kv capacity\" \/>\n\t\t<meta property=\"article:tag\" content=\"cottage industries\" \/>\n\t\t<meta property=\"article:tag\" content=\"distribution sectors\" \/>\n\t\t<meta property=\"article:tag\" content=\"earthquake reconstruction\" \/>\n\t\t<meta property=\"article:tag\" content=\"electricity transmission\" \/>\n\t\t<meta property=\"article:tag\" content=\"energy sector development\" \/>\n\t\t<meta property=\"article:tag\" content=\"grant assistance\" \/>\n\t\t<meta property=\"article:tag\" content=\"kalikashan substation\" \/>\n\t\t<meta property=\"article:tag\" content=\"kfw development bank\" \/>\n\t\t<meta property=\"article:tag\" content=\"nepal electricity authority (nea)\" \/>\n\t\t<meta property=\"article:tag\" content=\"nepal-germany cooperation\" \/>\n\t\t<meta property=\"article:tag\" content=\"nepal-germany economic support programme\" \/>\n\t\t<meta property=\"article:tag\" content=\"power distribution substations\" \/>\n\t\t<meta property=\"article:tag\" content=\"ratmate substation\" \/>\n\t\t<meta property=\"article:tag\" content=\"reliable power supply\" \/>\n\t\t<meta property=\"article:tag\" content=\"news\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-11-03T10:40:53+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-11-03T10:40:53+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/facebook.com\/Shreepost\" \/>\n\t\t<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/profile.php?id=100091501946887\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@Shreepost\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Two electricity distribution substations inaugurated -\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@Shreepost\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#blogposting\",\"name\":\"Two electricity distribution substations inaugurated -\",\"headline\":\"Two electricity distribution substations inaugurated\",\"author\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/#person\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/shreepost.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp\",\"width\":1371,\"height\":902},\"datePublished\":\"2023-11-03T10:40:53+00:00\",\"dateModified\":\"2023-11-03T10:40:53+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#webpage\"},\"articleSection\":\"News, 33\\\/11 kV capacity, Cottage industries, Distribution sectors, Earthquake reconstruction, Electricity transmission, Energy sector development, Grant assistance, Kalikashan substation, KfW Development Bank, Nepal Electricity Authority (NEA), Nepal-Germany cooperation, Nepal-Germany Economic Support Programme, Power distribution substations, Ratmate substation, Reliable power supply\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/shreepost.com\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?cat=20#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?cat=20#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/shreepost.com\\\/?cat=20\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#listItem\",\"name\":\"Two electricity distribution substations inaugurated\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#listItem\",\"position\":3,\"name\":\"Two electricity distribution substations inaugurated\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?cat=20#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/#person\",\"name\":\"Shree Post\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#personImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e20e3db5b8d116bf77295968b9c799350aef6b311ef9863c2f654c821dec0104?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Shree Post\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?author=1#author\",\"url\":\"https:\\\/\\\/shreepost.com\\\/?author=1\",\"name\":\"Shree Post\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e20e3db5b8d116bf77295968b9c799350aef6b311ef9863c2f654c821dec0104?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Shree Post\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#webpage\",\"url\":\"https:\\\/\\\/shreepost.com\\\/?p=3327\",\"name\":\"Two electricity distribution substations inaugurated -\",\"description\":\"Two power distribution substations, each of 33\\\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/shreepost.com\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327\\\/#mainImage\",\"width\":1371,\"height\":902},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/?p=3327#mainImage\"},\"datePublished\":\"2023-11-03T10:40:53+00:00\",\"dateModified\":\"2023-11-03T10:40:53+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/shreepost.com\\\/#website\",\"url\":\"https:\\\/\\\/shreepost.com\\\/\",\"name\":\"Shree Post\",\"description\":\"The News Werbsite, hot news, sports,cricket, football,world news, how to make money,  how to make money online for beginners, how to earn money online without investment, how to earn money online for students, how to earn money online without investment in mobile, make money online from home, how to make money online for free, real ways to make money from home for free, how to earn money from home without any investment,\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/shreepost.com\\\/#person\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Two electricity distribution substations inaugurated -","description":"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant","canonical_url":"https:\/\/shreepost.com\/?p=3327","robots":"max-image-preview:large","keywords":"33\/11 kv capacity,cottage industries,distribution sectors,earthquake reconstruction,electricity transmission,energy sector development,grant assistance,kalikashan substation,kfw development bank,nepal electricity authority (nea),nepal-germany cooperation,nepal-germany economic support programme,power distribution substations,ratmate substation,reliable power supply,news","webmasterTools":{"google-site-verification":"EFgOVK1wDx8T7ezNrLPN4nWq0wE6SeBOdCKs7scNI-Q","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/shreepost.com\/?p=3327#blogposting","name":"Two electricity distribution substations inaugurated -","headline":"Two electricity distribution substations inaugurated","author":{"@id":"https:\/\/shreepost.com\/?author=1#author"},"publisher":{"@id":"https:\/\/shreepost.com\/#person"},"image":{"@type":"ImageObject","url":"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp","width":1371,"height":902},"datePublished":"2023-11-03T10:40:53+00:00","dateModified":"2023-11-03T10:40:53+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/shreepost.com\/?p=3327#webpage"},"isPartOf":{"@id":"https:\/\/shreepost.com\/?p=3327#webpage"},"articleSection":"News, 33\/11 kV capacity, Cottage industries, Distribution sectors, Earthquake reconstruction, Electricity transmission, Energy sector development, Grant assistance, Kalikashan substation, KfW Development Bank, Nepal Electricity Authority (NEA), Nepal-Germany cooperation, Nepal-Germany Economic Support Programme, Power distribution substations, Ratmate substation, Reliable power supply"},{"@type":"BreadcrumbList","@id":"https:\/\/shreepost.com\/?p=3327#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/shreepost.com\/#listItem","position":1,"name":"Home","item":"https:\/\/shreepost.com\/","nextItem":{"@type":"ListItem","@id":"https:\/\/shreepost.com\/?cat=20#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/shreepost.com\/?cat=20#listItem","position":2,"name":"News","item":"https:\/\/shreepost.com\/?cat=20","nextItem":{"@type":"ListItem","@id":"https:\/\/shreepost.com\/?p=3327#listItem","name":"Two electricity distribution substations inaugurated"},"previousItem":{"@type":"ListItem","@id":"https:\/\/shreepost.com\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/shreepost.com\/?p=3327#listItem","position":3,"name":"Two electricity distribution substations inaugurated","previousItem":{"@type":"ListItem","@id":"https:\/\/shreepost.com\/?cat=20#listItem","name":"News"}}]},{"@type":"Person","@id":"https:\/\/shreepost.com\/#person","name":"Shree Post","image":{"@type":"ImageObject","@id":"https:\/\/shreepost.com\/?p=3327#personImage","url":"https:\/\/secure.gravatar.com\/avatar\/e20e3db5b8d116bf77295968b9c799350aef6b311ef9863c2f654c821dec0104?s=96&d=mm&r=g","width":96,"height":96,"caption":"Shree Post"}},{"@type":"Person","@id":"https:\/\/shreepost.com\/?author=1#author","url":"https:\/\/shreepost.com\/?author=1","name":"Shree Post","image":{"@type":"ImageObject","@id":"https:\/\/shreepost.com\/?p=3327#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e20e3db5b8d116bf77295968b9c799350aef6b311ef9863c2f654c821dec0104?s=96&d=mm&r=g","width":96,"height":96,"caption":"Shree Post"}},{"@type":"WebPage","@id":"https:\/\/shreepost.com\/?p=3327#webpage","url":"https:\/\/shreepost.com\/?p=3327","name":"Two electricity distribution substations inaugurated -","description":"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/shreepost.com\/#website"},"breadcrumb":{"@id":"https:\/\/shreepost.com\/?p=3327#breadcrumblist"},"author":{"@id":"https:\/\/shreepost.com\/?author=1#author"},"creator":{"@id":"https:\/\/shreepost.com\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp","@id":"https:\/\/shreepost.com\/?p=3327\/#mainImage","width":1371,"height":902},"primaryImageOfPage":{"@id":"https:\/\/shreepost.com\/?p=3327#mainImage"},"datePublished":"2023-11-03T10:40:53+00:00","dateModified":"2023-11-03T10:40:53+00:00"},{"@type":"WebSite","@id":"https:\/\/shreepost.com\/#website","url":"https:\/\/shreepost.com\/","name":"Shree Post","description":"The News Werbsite, hot news, sports,cricket, football,world news, how to make money,  how to make money online for beginners, how to earn money online without investment, how to earn money online for students, how to earn money online without investment in mobile, make money online from home, how to make money online for free, real ways to make money from home for free, how to earn money from home without any investment,","inLanguage":"en-US","publisher":{"@id":"https:\/\/shreepost.com\/#person"}}]},"og:locale":"en_US","og:site_name":"Shree Post - The News Werbsite, hot news, sports,cricket, football,world news, how to make money,  how to make money online for beginners, how to earn money online without investment, how to earn money online for students, how to earn money online without investment in mobile, make money online from home, how to make money online for free, real ways to make money from home for free, how to earn money from home without any investment,","og:type":"article","og:title":"Two electricity distribution substations inaugurated -","og:description":"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant","og:url":"https:\/\/shreepost.com\/?p=3327","fb:admins":"https:\/\/www.facebook.com\/visionnepal24","og:image":"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp","og:image:secure_url":"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp","og:image:width":1371,"og:image:height":902,"article:tag":["33\/11 kv capacity","cottage industries","distribution sectors","earthquake reconstruction","electricity transmission","energy sector development","grant assistance","kalikashan substation","kfw development bank","nepal electricity authority (nea)","nepal-germany cooperation","nepal-germany economic support programme","power distribution substations","ratmate substation","reliable power supply","news"],"article:published_time":"2023-11-03T10:40:53+00:00","article:modified_time":"2023-11-03T10:40:53+00:00","article:publisher":"https:\/\/facebook.com\/Shreepost","article:author":"https:\/\/www.facebook.com\/profile.php?id=100091501946887","twitter:card":"summary_large_image","twitter:site":"@Shreepost","twitter:title":"Two electricity distribution substations inaugurated -","twitter:description":"Two power distribution substations, each of 33\/11 kV capacity, have been inaugurated in Nuwakot and Rasuwa. The substations were constructed under the Nepal-Germany Economic Support Programme. One substation is constructed at Ratmate of Belkotgadhi Municipality in Nuwakot district while the next substation is built at Kalikashan, Kalika Rural Municipality of Rasuwa district with the grant","twitter:creator":"@Shreepost","twitter:image":"https:\/\/shreepost.com\/wp-content\/uploads\/2023\/11\/German-funded-Substations-Inaugurated-in-Nepals-Nuwakot-and-Rasuwa-Districts-for-Enhanced-Power-Distribution.webp"},"aioseo_meta_data":{"post_id":"3327","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-01-26 06:54:09","updated":"2024-01-26 06:54:09","seo_analyzer_scan_date":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/shreepost.com\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/shreepost.com\/?cat=20\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTwo electricity distribution substations inaugurated\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/shreepost.com\/"},{"label":"News","link":"https:\/\/shreepost.com\/?cat=20"},{"label":"Two electricity distribution substations inaugurated","link":"https:\/\/shreepost.com\/?p=3327"}],"_links":{"self":[{"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/posts\/3327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shreepost.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3327"}],"version-history":[{"count":1,"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/posts\/3327\/revisions"}],"predecessor-version":[{"id":3330,"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/posts\/3327\/revisions\/3330"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/shreepost.com\/index.php?rest_route=\/wp\/v2\/media\/3329"}],"wp:attachment":[{"href":"https:\/\/shreepost.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shreepost.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shreepost.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}